November
2010 Update -
Letter
from Winakwa's President
WINAKWA EXPANSION PICTURES
Check out the
latest pictures of our
expansion!
Nov 26,2010 - Temperature
of -14 C, installing rebar and
water lines to heat the cement.

Installing a portion of the
floor.

The interior wall was removed
between the front entrance and
the skate exchange to
make
way for the large grand hall.

Heating and hoarding for the
brick layers. Behind the tarps
are two interior walls with a
lot of
electrical and plumbing within
them.

The wall you see here is a
portion of the new interior wall
in the gym.

Site inspection from Shelly
Glover, MP for St. Boniface
(centre), meeting with Rob
Gobeil,
President of Winakwa Community
Centre (right) and Tim Doherty,
Site Supervisor for Fabca
Projects (left).

Digging the first of 128 pile
holes that range from 8.5 to 15
metres in depth.

Exterior wall removed from
dressing rooms 7 and 8.

Preparing the forms for the
grade beam.

The grade beam is
complete and ready for 50 metres
of concrete.

The
start of the new Winakwa
entrance.

The front
entrance grade beam.

35
mm of rain puts a damper on
construction!

Check back for
new photos of our progress!