WINAKWA EXPANSION
August
2011 Update -
Letter from
Winakwa's President
March
2011 Update -
Letter from Winakwa's President
November
2010 Update -
Letter from Winakwa's President
WINAKWA EXPANSION PICTURES
Check out the latest pictures of our expansion!
June 2011
Grand hall.

Common area benches.

Gymnasium - 10,733 ft2, ceiling
height 25 feet to bottom of rafters.

Bar/kitchen off of the gym.

Main floor multi purpose room.

Women's restroom.

Men's restroom.

Second floor mechanical room.

Stairwell to audio/mechanical room.

One of the four new 250 ft2
dressing rooms.

May 2011
Finished east exterior wall.

North interior gym wall.

Front entrance with finished brick.

Second floor mechanical room.


March 2011
New
control/office space.

New
front entrance.

The east interior wall of the new gym.

The new
very large common area with the office on the right side.

Back to top of page
November 2010
Temperature of -14 C,
installing rebar and water lines to heat the
cement.

Installing a portion of
the floor.

The interior wall was removed between the
front entrance and the
skate exchange to
make
way for the large grand hall.

Heating and hoarding for
the brick layers. Behind the tarps are two
interior walls with a lot
of electrical and plumbing within them.

A
portion of the new interior wall in the gym.

Site inspection from
Shelly Glover, MP for St. Boniface (centre),
meeting with Rob Gobeil,
President of Winakwa Community Centre
(right) and Tim Doherty,
Site Supervisor for Fabca Projects (left).

Digging the first of 128 pile holes that
range from 8.5 to 15 metres
in depth.

Exterior wall removed from dressing rooms 7
and 8.

Preparing the forms for the
grade beam.

The grade beam is complete and ready for 50 metres of
concrete.

The start of the new Winakwa entrance.

The front entrance grade beam.

35 mm of rain puts a damper on construction!

Check back for new photos of our progress!